Panel Size Specifications
Model Number | SHV78CM3N |
Product Type | Built-in Dishwasher |
Overall Height | 815 mm |
Overall Width | 598 mm |
Overall Depth | 550 mm |
Panel Height Required | 815 mm |
Panel Width Required | 598 mm |
Panel Thickness Range | 15-25 mm |
Weight | 32.5 kg |
Color Finish | Stainless Steel |
Panel Material Requirements
- Material Type: Wood, MDF, or similar rigid material
- Thickness Range: 15-25 mm (optimal: 19 mm)
- Surface Finish: Must be flat and even
- Weight Capacity: Panel must support mounting hardware
Installation Requirements
Tools Needed:
- Measuring tape
- Level
- Power drill
- Screwdrivers (flat and Phillips)
- Jigsaw or router
- Clamps
Step-by-Step Panel Installation
- Measure Cabinet Opening: Ensure cabinet opening matches required dimensions (598mm width x 815mm height)
- Prepare Panel: Cut panel to exact dimensions of 598mm x 815mm with thickness between 15-25mm
- Mark Mounting Points: Position panel and mark drilling points for mounting brackets
- Drill Holes: Drill precise holes for mounting hardware according to template
- Attach Mounting Brackets: Secure mounting brackets to the panel using provided screws
- Install Panel: Attach panel to dishwasher door following manufacturer's instructions
- Adjust Alignment: Use level to ensure panel is perfectly vertical and adjust as needed
- Final Check: Test door opening and closing to ensure smooth operation
Important: All panel installations must maintain proper clearance and alignment for optimal performance and warranty coverage.
Cutout Dimensions
Cabinet Cutout Width | 560 mm |
Cabinet Cutout Height | 820 mm |
Cabinet Cutout Depth | 550 mm |
Minimum Cabinet Width | 600 mm |
Minimum Cabinet Height | 850 mm |
Mounting Bracket Positions | 4 points (top and bottom) |
Screw Hole Diameter | 4 mm |
Mounting Depth | 15 mm from panel edge |
Cutout Preparation Guidelines
- Ensure cabinet opening is square and level before installation
- Allow 2mm clearance on all sides for proper fit
- Check that cabinet structure can support dishwasher weight
- Verify electrical and plumbing connections are accessible
Clearance Requirements
Side Clearance (Minimum) | 5 mm each side |
Top Clearance (Minimum) | 10 mm |
Bottom Clearance (Minimum) | 50 mm |
Rear Clearance (Minimum) | 20 mm |
Door Opening Clearance | Full 90-degree opening required |
Ventilation Space | Front ventilation only |
Installation Space Considerations
Adjacent Cabinets
Ensure adjacent cabinets and drawers can open fully without interfering with dishwasher door operation.
Floor Leveling
Dishwasher must be installed on a level floor to ensure proper door alignment and panel fit.
Electrical Access
Maintain access to electrical connection point while ensuring panel covers all components.
Plumbing Access
Water supply and drain connections must remain accessible after panel installation.
Technical Downloads
Current Model Documentation
SHV78CM3N
Panel Installation Guide
SHV78CM3N
Technical Specifications
SHV78CM3N
Installation Template
SHV78CM3N
User Manual
Related Models
SHV68CM3N
60cm Panel Dimensions
SHV88CM3N
90cm Panel Dimensions
SMI46KS01A
45cm Compact Model
SMV69X01EU
Freestanding Model
Note: For custom panel installations or non-standard cabinet sizes, consult the installation specialist or visit the Bosch Professional Support website.